PCP MECHANICAL ANCHOR

PRODUCT DETAILS

Working and use methods

Anchorage: While in progress the descent, stop pin is in the short track. When anchor is landed to a certain position, lift the rod string to a certain place then land it down so that control pin is switched to long track. After that slips are opened, blocked on casing.

Dis-anchorage: Lift the rod string, reset the slips.

Note:

Anchorage position must be kept away from casing coupling.

While taking off the lift sub, rod string can not be lifted up more than 0.2m to avoid accidently anchorage.

Model Diameter
(mm)
Minimum bore size
(mm)
Total length
(mm)
Connection thread Seat sealing force
(t)
Casing ID range
(mm)
Feb-51 φ115 φ48 1410 27/8 NUE 5~7 φ118.0~φ127.0
Aug-65 φ138 φ60 1480 27/8 NUE 5~7 φ144.0~φ152.0
7 φ150 φ60 1480 27/8 NUE 5~7 φ154.0~φ164.0
Aug-95 φ208 φ76 1765 31/2 NUE 8~10 φ216.0~φ228.0